We often get asked how long it takes for Shade Sails to be installed. The answer is it varies, but here is a general guide.
A typical custom shade sail installation takes 4 to 5 weeks as all the sail support posts are secured in concrete footings.
The concrete in the footings will cure up to 50% of their strength in 7 days, 75% of its strength in 14 days and 90% in 21 days.
We wait at least 14 days before returning to install the sail and tension.
This ensures the best result and you should never rush Shade Sail installation.